SL. NO. NAME OF ON-GOING SCHEME ESTIMATED AMOUNT * REMARKS
1 Immediate measures to close breach by construction of retirement on R/B of river Brahmaputra at Fulbari including pro-siltation measures under SDRF for 2013-14. 417.03 L Sanction accorded vide No. RGR.298/2014/28 dtd. 21-03-2014. The work could not be started in the year 2014 due LA problem. The work was started in the month of February,2015 and about 55% progress achieved till 15th April,2015. On completion of the scheme, a vast area of the district of Barpeta will get protected from flood inundation.
2 Immediate measures to M/E along B/B of river Pahumara from kathalmurighat to BB PWD Road on R/B and to Noukuchi village on L/B (Recoupment of damaged section due to change of river course at different reaches) for 2013-14 under SDRF. 98.51 L Sanction accorded vide No. RGR.462/2014/29 dtd. 14-07-2014. The work was started in the month of February,2015 about 55% progress achieved till 15th April,2015. The scheme envisages recoupment of flood damages caused to the embankment during the flood of 2014 in order to protect a vast area of Bajali Civil Sub-division in the district of Barpeta from flood devastation.
3 Immediate measures to close breach at 9th km (Mairambhita) including recoupment of damage section at different reaches of M.E. along B/B of river Pohumara from Kathalmurighat to Rly line under SDRF for 2014-15”. 142.63 L Sanction accorded vide No. RGR-43/2015/51 dtd. 18-02-2015. The work was started in the last week of March,2015 and about 30% progress has been achieved till 15th April,2015. On completion of the scheme a vast area of Bajali Civil Sub-division of Barpeta district including Moirambhita, Puthimari, Medhikucki villages etc. will get protected from flood inundation of river Pohumara.
4 Immediate measures to close breach at 16th km (Doulapathar) including recoupment of damage section at different reaches of M.E. along B/B of river Pohumara from Kathalmurighat to Rly line under SDRF for 2014-15”. 131.25 L Sanction accorded vide No. RGR-44/2015/52 dtd. 17-02-2015. The start of the work was delayed due to LA problem with the pattadars. However, the problem has been resolved now and about the progress will get expedited soon. On completion of the scheme a vast area of Bajali Civil Sub-division of Barpeta district including villages namely, Doulapathar, Hathinapur, Cheki, Medhikuchi, Kordoiguri, Bangti etc will get protected from flood inundation.
5 Protection of B/B of river Morachowlkhowa at various locations including construction of short retirement at ch. 2.20 km and ch. 5.30 km of Kadong extension embankment and at ch. 5.10 km and widening at ch. 3.20 km of Morachowlkhowa R/B embankment. 344.00 L Sanction accorded vide No. WR(C)137/2014/ 17 dtd.30-07-2014 under NABARD (RIDF-XIX). The scheme envisages protection of Morachowlkhowa L/B embankment near Fakaruddin Ali Ahmed medical College, Barpeta with boulder revetment and apron including pro-siltation measures at Gandhinagar, Bheragaon (L/B) and at Jaharpam and Rupakuchi on the R/B of river Morachowlkhowa. The work was started in the last week of January,2015 and about 35% progress has been achieved till 15th April,2015.
* Rs. in Lakhs

DEPARTMENT STRUCTURE


HEAD
EXECUTIVE ENGINEER 1 NO.
SUB HEAD
ASSTT. EXECUTIVE ENGINEER 4 NOS.
ASSTT. ENGINEER 2 NOS.
SEINOR ASSISTANT 8 NOS.
JUNIOR ASSISTANT 9 NOS.

CONTACT DETAILS


NAME DESIGNATION MOBILE NO EMAIL-ID
SRI SHELIMUDDIN AHMED E.E. 9435029545 shelim.2812@rediff.com
SRI MRIGANKA DEKA A.E.E.(T.C) 9864072961 mri.deka@gmail.com
SRI SAHEEDUZ ZAMAN A.E.E. 9864026136 saheed.zaman@gmail.com
SRI GOLAP DAS A.E.E. 9954324498
SRI DULAL HAZARIKA A.E.E. 9954053445
SRI PRADIP BAISHYA A.E. 9085416968
SRI PRADIP MEDHI A.E. 9678294711

CONTACT DETAILS


Executive Engineer
Barpeta Water Resources Division, Barpeta